-
- Policies
- Washington County Stormwater Management, Grading, and Soil Erosion & Sediment Control Ordinance
- City of Hagerstown – Stormwater Management Ordinance
- City of Hagerstown – Sediment Control Ordinance – Amended
- City of Hagerstown – Sediment Control Ordinance – Signature Page – Amended
- Plan Requirements, Fee Requirements, …
- “Fee Transmittal Form 2022“ (Must be included with any fees submitted to our office)
- Fees –
- Memo (Credit Card Payments) – (Effective July 1, 2022)
- 2022 Fee Increase Memo – (Effective September 1, 2022)
- 2022 Fee Increase (per plan fee)(Signed Resolution – Board of County Commissioners)
- WCSCD Fee Waiver Policy
- WCSCD Fee Waiver Request Form
- Checklist Review Form (April 2021)
- Standard Grading and Soil Erosion & Sediment Control Plan for Single Lot Single Family Residential Construction and Minor Earth Disturbances
- City of Hagerstown – Standard Plan
- Standard Plan Notes
- Standard Utility Notes
- Soil Erosion, Sediment Control, & Seeding Notes
- Soil Erosion, Sediment, & Seeding Notes for the Standard Grading …
- Seeding Summary (Temporary)
- Seeding Summary (Permanent)
- Sequence of Construction (Example)
- Sensitive Area Review – Criteria
- Sensitive Area Notice
- Soil Erosion and Sediment Control Plan (Title Page – Signature Blocks, etc.):
- Transmittal for Plans (Revised September 2015)
- 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control
- Dam Safety Reviews – New Maryland Department of the Environment Requirements (To be effective, January 1, 2023) –
- Forest Harvest Operation Procedures/Forms –
- Standard Plan Form – (Memorandum)
- Policies
- Standard Erosion and Sediment Control Plan for Forest Harvest Operations (Printable)
- Standard Erosion and Sediment Control Plan for Forest Harvest Operations – (Fillable)
- Forest Harvest Operations – (Submission Packet) – Revised Fee, Effective, September 1, 2022!
- Washington County Division of Plan Review & Permitting – Owner’s Representative Affidavit
- Washington County Division of Plan Review & Permitting -Commercial Logging Entrance Bond
- Washington County Department of Planning & Zoning (Forest Conservation Ordinance – Request for Exemption)
- Washington County Department of Planning & Zoning (Washington County Forest Conservation Ordinance) – Forestry Declaration of Intent
- Washington County Department of Planning & Zoning – Fee Worksheet
- Soil Conservation Packet (Review Fee $190) – Revised Fee, Effective, September 1, 2022!
- Maryland Consulting and Industrial Foresters
- 2015 Maryland Soil Erosion and Sediment Control Standards and Specifications for for Forest Harvest Operations